If for example two jobs are scheduled at the same time or with overlap. Are scheduled jobs executed in separate threads or are they executed one at the time in serie? With STARTSESSION available all jobs in job queue could be executed in parallell, but I assume jobs still are processed in a serie like in NAV2009 ?
Regards Fredrik
Regards Fredrik