Quantcast
Channel: NAV Three Tier — mibuso.com
Viewing all articles
Browse latest Browse all 10032

[solved] Capacity Constrained Resource - how to setup?

$
0
0
We have got an oven to heat up material in some routing task. This oven needs setup time to heat up and to cool down. Thats not a problem.
This oven has got a physical capacity which is measured in volume or in some units of loading equipment. (e.g. spindle)

Now we want to limit the capacity of this oven up to a concrete volume or a quantity os spindles.
How can we set this up?

Viewing all articles
Browse latest Browse all 10032

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>